12
« on: September 21, 2020, 10:43:47 am »
Because it will still take over a year for the POWER10 to materialize, I was wondering if IBM would participate in a POWER9+? A die-shrink of the current POWER9 to 7nm or 5nm.
Since the POWER9 is open-source, how difficult would it be for Raptor to do this or to order it from e.g. Samsung?
In the long run it would probably be advantageous in price and Raptor would be independent from IBM.